Applicable to 12 foot too.
1. Remove pitman arms.
2. Remove two big gears
3. Remove main shaft/ hub assembly.
4. Install main shaft long bearing after removing old one.
5. Install new babbit bearing between two new small gears on main shaft.
6. Key main shaft with cotter key.
7. Install rebuilt /new big gears & bearing, tighten hold down strap.
8. Install new/rebuilt pitman arms.
9. Install new trolley shaft if needed & make sure oil ring in place.
When reinstalling head, if stub pipe is old , seriously consider new stub pipe. Make sure all bolts tight on stub tower.
Fill with 1 quart for six foot aerometer, 2 quarts for 8 foot aerometer.
In operation check every three months.